TALL have completed an array of safe lifting studies, acting as either the lifting engineer or third party reviewer. Elements to be lifted tend to range in size up to 50T with a list of recent projects is listed as below:-
Headland Park supertee and headstock lifting on suspended slabs
Wynyard Walk temporary works assessment for piling rig and tower crane lifting with Crane set up over Clarence Street pedestrian tunnel
Blackall Road demolition plant lifting on suspended podium slab
Bonville Bridge precast deck lifting
Garden Island Integrated Weapons Workshop inter-building link bridge removal.
Wollongong Hospital Dosa Building demolition
British American Tobacco roof access gantry removal (via helicopter)
British American Tobacco Stack demolition
Royal North Shore Hospital transfer truss removal,
Pennant Hills Station Pedestrian over bridge removal
Barangaroo Counterforte Wall 18m retaining wall reinforcement cage lifting
Gateway bridge column reinforcement cage liftings for bridges 1716, 1723 and 1727
SancroxHW10 Bridge column and main pier base reinforcement cage lifting
Robertson Oval 1.9m diameter pile reinforcement cage lifting